Project Highlight At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. Designed to advance ESG targets, the installation boosts system dependability while cutting overall power consumption and CO₂ emissions. https://bookmarkingdelta.com/story20677617/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction