The period on the house levelling method relies on different aspects such as the sizing on the house, the extent with the foundation destruction, as well as the accessibility of the site. To be a common rule, the method usually takes between a couple of days to a couple weeks. https://bookmarkusers.com/story19916627/the-definitive-guide-to-best-way-to-level-a-floor-in-an-old-house